O N B O A R D I N G P R O C E S S
Step 2: On-site consultation
Pre-Consultation • Once our surveyors receive the property information they will reach out to the designated contacts to schedule an on-site visit.
Consultation • As soon as the consultant arrives onsite, they will need to meet the Designated Contact who should be prepared to review the proposed installation site. • The consultant will take pictures and measurements as well as verifying cellular signal strength, and reviewing CAT5 and electrical outlets and electrical outlets. • During the consultation, the surveyor and designated contact will agree on a definite locker placement location and other locker details. Post-Consultation • The consultant will prepare a detailed installation guide, which will include Hub size and color, location, and any site preparation requirements (if needed). • The designated contact/property owner will receive an automated approval email with the installation guide and pricing. That person will need to review and approve the layout, or request changes. • After the layout is approved and finalized, we will route the Location Agreement via DocuSign for signature.
14
Amazon Confidential | This document contains confidential and proprietary information furnished for evaluation purposes only. Except with the express prior written permission of Amazon, such information may not be reproduced, published, disclosed or used for any other purpose.
Made with FlippingBook - Online magazine maker