August 13 2020- Director's Report

O N B O A R D I N G P R O C E S S

Pre-Installation • The Owner/Designated Contact is responsible for coordinating all required site preparation (if needed) and will notify Amazon once work is complete. • Our operations team will then review the site preparation responses, and move forward with routing the lockers to the local area market. Installation • Once the lockers arrive in market, our installers will coordinate a pre-installation walk through with the property and set an installation date with the on-site staff directly. • The installation team will place the lockers in the approved area, level the unit, and bolt the Starter and Expanders together. • If indoor location, they will plug the Hub into the outlet. • If outdoor location, they will anchor the Hub into the ground with 4 bolts. The Designated Contact will need to ensure an electrician will be on-site within 24 hours to complete the final hookup to the disconnect box, and notify Amazon once the final electrical connection is complete. • Within 48 hours of power connection, a technician will arrive on-site to provision the Apartment Locker. Activation • Once the lockers are installed and fully set-up, the property will log into their manager portal and activate the lockers. Step 3: Apartment Locker installation

135

Amazon Confidential | This document contains confidential and proprietary information furnished for evaluation purposes only. Except with the express prior written permission of Amazon, such information may not be reproduced, published, disclosed or used for any other purpose.

Made with FlippingBook - Online magazine maker