SUPDEV Morehouse College Proposal TST AS9100

www.RigFab.com

Page 26

Ensure internal audit schedules cover all areas of the QMS.

Do internal audit schedules cover all areas of the QMS?

37. Internal Audit Program

37.1 Audit Schedules

Audit Schedules, Coverage Reports

Verify internal audits are executed according to the schedule.

Are internal audits executed according to the schedule?

37.2 Audit Execution

Audit Reports, Execution Logs

Confirm follow-up actions from audits are tracked and closed.

Are follow-up actions from audits tracked and closed?

37.3 Audit Follow-up

Follow-up Logs, Closure Records

Ensure calibration schedules for measuring equipment are defined and followed.

Are calibration schedules for

38.1 Calibration Schedules

Calibration Schedules, Calibration Certificates

38. Calibration and Testing

measuring equipment defined and followed?

Verify testing procedures for product conformity are documented and followed.

Are testing procedures for product conformity documented and followed?

38.2 Testing Procedures

Test Procedures, Test Records

Ensure supplier qualification criteria are defined and applied.

Are supplier qualification criteria defined and applied?

39.1 Supplier Qualification Criteria

Qualification Criteria, Supplier Evaluation Records

39. Supplier Qualification

39.2 Supplier Re- evaluation

Verify suppliers are re- evaluated periodically.

Are suppliers re- evaluated periodically?

Re-evaluation Records, Performance Reviews

Ensure emergency preparedness plans are defined and communicated.

Are emergency preparedness plans defined and communicated?

40. Emergency Preparedness

40.1 Emergency Plans

Emergency Plans, Communication Records

Verify emergency drills are conducted regularly.

Are emergency drills conducted regularly?

40.2 Emergency Drills

Drill Reports, Attendance Logs

Ensure change control processes are defined and implemented.

Are change control processes defined and implemented?

41.1 Change Control Process

41. Change Management

Change Control Procedures, Change Logs

Verify impact analysis for changes is conducted and documented.

Is impact analysis for changes conducted and documented?

41.2 Change Impact Analysis

Impact Analysis Reports, Change Records

This expanded checklist ensures a thorough and comprehensive audit of the Quality Management System by covering all critical aspects and requirements. Each section includes specific audit checklist items, questions, and required Objective Quality Evidence (OQE) to ensure effective auditing and compliance verification.

Made with FlippingBook - Share PDF online