FIling Cabinets Anco steel_workbench_assembly

STEEL WORKBENCH

Assembly Instructions

1

2

3

Beam profile

Top view

Side view

Threaded holes

Front beam

Frame (legs)

Worktop

Leg

1. Attach (slot-in) the undershelf to both frames

4

* 5

2. Attach the front and back beams to the frames using 8 x M8 mushroom head bolts and nuts (4 per beam). Tighten with 5mm allen key. Make sure the threaded holes across the beams point downwards, these are used to attach the drawer units! 3. Place the worktop on top of the frame, matching the holes on the worktop with the holes on the frames and secure with 4 x M8 nuts and countersunk bolts in corners.

Side view

B

A

A

4. Install the central support beam underneath the worktop as shown on the image and secure with 2 x M8 nuts and countersunk bolts.

*5. (optional) Installation of suspended and full height drawer units: Drawers must be removed from the units before installation!

A. Select position for full height drawer unit and slide the drawer frame in between the worktop and the undershelf. Match the holes at the top of the drawer frame with the threaded holes on the beams. Secure with 4 x M8 hex head bolts. B. Select position for the suspended drawer and pre-screw 2 x M8 hex head bolts to the back beam. Slide the drawer frame into these pre-screwed bolts and secure with other 2 x M7 bolts onto the front beam, matching the holes on the drawer frame and the holes on the beam.Tighten all with 13mm Spanner.

Front beam

Central support

Back beam

Worktop

B

A

Back beam

Threaded holes

Bottom View

Bottom View

Back beam

Back beam

5mm Allen key, 13mm Spanner Tools Required

Drawer frame

Drawer frame

Two competent people wearing safety gloves , safety shoes and protective eyeware are recommended to undertake the assembly. Safety Precaution

Front beam

Front beam

scan for more info

Made with FlippingBook - Online magazine maker