• Robinson Run South Branch Bridge No. 3 (Scotch Hill Road) – Bridge replacement as well as installation of new pavement, guide rail, pavement markings, and signage • Squaw Run Bridge No. 7 (Old Freeport Road) – Bridge preservation work as well as new pavement, guide rail, pavement markings, and signage • Stillhouse Run Bridge No. 1 (Duncan Avenue) – Bridge rehabilitation work, replacement of a sanitary sewer line, as well as installation of a rock embankment, drainage pipe, and guide rail. • Thompson Run East Branch Bridge No. 2 (Jones Avenue) – Bridge replacement as well as installation of new pavement, sidewalk, drainage structures, guide rail, pavement markings, and signage
SERVICE REQUESTS
PROJECT DESIGN & CONSTRUCTION 61 projects actively in design or under construction $166 million estimated value of active projects in 2022
Service requests completed in 2022 included roadway and shoulder repairs, engineering services, drainage improvements, snow and ice removal, vegetation maintenance and removal, litter pickup, road sign replacement, roadway line painting, and banner creation.
1,359 service requests completed
61 Projects Actively in Design or under Construction
Service Requests Completed
2,090
46
43
41 47
1,091 1,336 1,359
FLEET 798 vehicles and pieces of heavy equipment maintained
Type of Equipment
Quantity
Type of Equipment
1 1 1 1 1 1 1 1 1 Quantity
Rubber tire excavator Asphalt milling machine Asphalt paver Asphalt road widener Track loader Hydraulic hammer Hydraulic auger Hay bailer Telehandler
Backhoe Woodchipper Hi-lift/loader Track excavator Skid steer Forklift Brush hog tractors Cold planer Asphalt roller
13 9 8 4 4 4 3 2 2
16 hybrid 15 electric 6 natural gas
TOTAL 58
60