Allegheny County 2022 Highlights Report

• Robinson Run South Branch Bridge No. 3 (Scotch Hill Road) – Bridge replacement as well as installation of new pavement, guide rail, pavement markings, and signage • Squaw Run Bridge No. 7 (Old Freeport Road) – Bridge preservation work as well as new pavement, guide rail, pavement markings, and signage • Stillhouse Run Bridge No. 1 (Duncan Avenue) – Bridge rehabilitation work, replacement of a sanitary sewer line, as well as installation of a rock embankment, drainage pipe, and guide rail. • Thompson Run East Branch Bridge No. 2 (Jones Avenue) – Bridge replacement as well as installation of new pavement, sidewalk, drainage structures, guide rail, pavement markings, and signage

SERVICE REQUESTS

PROJECT DESIGN & CONSTRUCTION 61 projects actively in design or under construction $166 million estimated value of active projects in 2022

Service requests completed in 2022 included roadway and shoulder repairs, engineering services, drainage improvements, snow and ice removal, vegetation maintenance and removal, litter pickup, road sign replacement, roadway line painting, and banner creation.

1,359 service requests completed

61 Projects Actively in Design or under Construction

Service Requests Completed

2,090

46

43

41 47

1,091 1,336 1,359

FLEET 798 vehicles and pieces of heavy equipment maintained

Type of Equipment

Quantity

Type of Equipment

1 1 1 1 1 1 1 1 1 Quantity

Rubber tire excavator Asphalt milling machine Asphalt paver Asphalt road widener Track loader Hydraulic hammer Hydraulic auger Hay bailer Telehandler

Backhoe Woodchipper Hi-lift/loader Track excavator Skid steer Forklift Brush hog tractors Cold planer Asphalt roller

13 9 8 4 4 4 3 2 2

16 hybrid 15 electric 6 natural gas

TOTAL 58