Allegheny County 2022 Highlights Report

Brillant Line $4,740,000 awarded Aspinwall, Pittsburgh Vinegar Hollow Greenway $346,248 awarded Ben Avon, Emsworth, Kilbuck Drake Trail $150,000 awarded Bethel Park Turtle Creek Connector $2,512,509 awarded Braddock, East Pittsburgh, Monroeville, North Braddock, North Versailles, Pitcairn, Rankin, Trafford, Turtle Creek Three Rivers Heritage Trail $462,550 awarded East Deer, Springdale Township

Acquisition of 3.6 miles of railway and line vacations that will connect Aspinwall and Pittsburgh Acquisition of five parcels of land to permanently protect 46 acres of greenspace for public benefit, including access to approximately 2 miles of public trails Engineering and design of the proposed Drake Trail and amenities including a new railing for the existing bridge, a new parking area, a retaining wall, trail development, seating areas, trail access, planting and other trail clearing and landscaping Design and engineering of nine miles of trail and on-road infrastructure between the Carrie Blast Furnaces National Historic Landmark in site to the end of the Westmoreland Heritage Trail in Trafford

Design and engineering for the expansion of the Three Rivers Heritage Trail connecting the municipalities to the larger trail network, the Erie to Pittsburgh trail system

Riverfront Walking Trail $250,000 awarded Elizabeth Borough

Construction of a concrete walking trail to facilitate public access to the borough’s riverfront

Neville Riverfront Park Trail Improvements $500,000 awarded Neville Commodore Perry Regional Trail System $1,400,000 awarded Marshall Little Pine Creek Connector Trail $400,000 awarded Etna, Shaler Three Rivers Heritage Trail $678,700 awarded Harmar, O’Hara

Design and engineering of the Little Pine Creek Connector Trail which will extend from Kiwanis Park in Shaler to Etna’s Riverfront Trail and Park Design and engineering for the expansion of the Three Rivers Heritage Trail connecting the municipalities to the larger trail network, the Erie to Pittsburgh trail system Construction of sidewalk and trail segments that address gaps in the sidewalk network and provide for continuous, safe pedestrian access; several of the segments are part of the Commodore Perry Regional Trail system Site preparation, installation of amenities and construction of a boat launch, waking and cycling trails, a bicycle repair station, and restoration and appurtenances for a new riverfront park