How long does a Knockdown Rebuild take?
This depends on whether it’s a single or double storey, dual living or duplex, plus you need to take into consideration other variables including:
• The size of the build • Local planning approval • Council permits • Number of changes to scope • Soil conditions & rectification (if required) • Tree removal • Demolition & Site preparation including disconnection/removal of existing services (e.g. water, gas, electricity, etc.) • Where the property is located • Weather impacts during construction
For a better understanding of time frames, chat to a New Homes Consultant.