C+S November 2022 Vol. 8 Issue 11 (web)

CONTENTS

PAGE 19

THE COVER Nondestructive Testing: The Key to Bridge Longevity – story on page 10 CHANNELS ENVIRONMENTAL + SUSTAINABILITY 12 Helping a Hospital Weather Climate Threats 13 Wildlife Crossings Bridge the Gap 16 Taking to the Wind for Climate Change 19 Delivering Bridge Projects with Environmental Knowledge and Discipline STRUCTURES + BUILDINGS 21 Uncommon MSE Wall Failure Calls for Unique Geotechnical Solutions 24 Aiding after a Catastrophe: Autodesk and the Notre Dame Cathedral Fire 26 ASCE Alaska Section Historic Civil Engineering Landmark Designation 28 Bridging the Gap: The Future of Bridge Construction TRANSPORTATION + INFRASTRUCTURE 31 How MaineDOT Replaced an Interstate Bridge In 60 Hours 33 Solving the Labor Shortage to Support Infrastructure Progress 35 Replacing the Hickman Road Bridge WATER + STORMWATER 37 Four Basic Steps to Begin an Accurate Site Analysis for an Onsite Wastewater Treatment Plant Design BUSINESS NEWS 39 Building a Bridge Between Past and Future 40 Recruiting, Retraining, and Developing a Diverse Engineering Team SURVEYING 42 The Three Advantages of the Leica AP20 AutoPole That Impress Me the Most

PAGE 21

departments 8 Events 44 Reader Index

Columns INDUSTRY INSIGHTS 5 Affecting Change: The 2022 ElevateHer Symposium Jamie Claire Kiser LOOKING BACK, MOVING FORWARD 6 Engineering the Rialto Bridge Luke Carothers

PAGE 26

3

November 2022

csengineermag.com

Made with FlippingBook Annual report