JHC_ Tesco Road Surface Upgrade Genco_Hove_17.03.25_ RAMs_R1

Section 7 – Materials Storage and Deliveries

Delivery Arrangements:

All deliveries and collections will be co-ordinated with Genco Construction project team and planned in advance. JHC deliveries will adhere to the traffic management plan. All delivery vehicles will be stationary within the designated loading area. Our vehicles will be stationary, with the engines and lights turned off to minimise our carbon emissions, light pollution, and noise pollution. A suitable and sufficient exclusion zone(s) will be erected within the loading area during the materials transportation into the building. It’s foreseen that minimal pedestrians will be affected by our works, as all loading and unloading activities will be undertaken within an exclusive loading area, which is manned by a trained traffic marshal. The JHC team will display suitable and appropriate safety signage, making persons aware of any foreseeable hazards during these activities. Material storage will be kept to a minimum. JHC plant and equipment will be stored within the ground floor of the car park ensuring clear route(s) are maintained at all times. All materials will be stored within segregation, and not stood up against the walls, in preparation for the works.

Public Protection:

Storage Arrangements:

Section 8 – CoSHH Assessment & Safety Data Sheets/ Vibration, Noise and Dust Management

CoSHH Substances being used

JHC do not foresee CoSHH substances being used and shall be reviewed regularly for effectiveness.

It’s not foreseen that JHC will use vibrating tools during our decoration activities. However, In the unlikely event our working teams use vibrating tools we shall implement the following: • All vibration activities will be recorded on a HAV sheet, and the records will be kept for 3 years after the project finishes. Operatives will take regular breaks and alternate the use of any vibrating tools. • The vibration magnitude will be monitored, ensuring JHC operatives do not exceed their daily limit. It’s not foreseeable that JHC will be undertaking noisy works during our working activities. However, our operatives will remain respectful to the Genco Construction project teams and the local community by adhering the noisy works programme which will be outlined by. The team will be advised that shouting is not permitted unless for emergency purposes only JHC.

Hand Arm Vibration (HAVs)

Noise Management

JHC_Tesco Hove Ground Works Upgrade R1