JHC_ Tesco Road Surface Upgrade Genco_Hove_17.03.25_ RAMs_R1

Slips, trips and falls

All materials to be stored in the designated safe area(s).

3 3 9

1

3

3

Operatives Contractors

• • •

Musculoskeletal injuries.

JHC materials and equipment to be stored correctly by lying down in designated areas. No materials should be left standing or leaning upright.

Members of the public

Good housekeeping will be maintained at all times

All PPE and tools to be stored in the designated area when not being used.

Suitable footwear will be worn at all times

Maintain good cable management within the project, hang cables above head height when practicable. JHC will endeavour to use battery powered tools when practicable.

All JHC debris to be cleared into waste bags as soon as practicable as work proceeds.

Supervisor will monitor work areas for adverse weather conditions i.e. ice and snow. A specific risk assessment will be developed for adverse weather conditions.

Supervisor will monitor works areas daily to ensure areas are kept tidy.

Hard hat, safety boots, high visibility vests and sufficient gloves to be worn at all times.

JHC_Tesco Hove Ground Works Upgrade R1