JHC_ Tesco Road Surface Upgrade Genco_Hove_17.03.25_ RAMs_R1

Supervisor to periodically monitor employees if they have any symptoms of HAVS or uncomfortable strains on hands and arms.

Daily trigger time logs to be recorded by operatives.

Trailing cables to be as short in length as practicable and hung overhead or otherwise kept out of walkways and traffic routes and made safe.

Cables to be checked daily for damage

Personal protective equipment

JHC will reserve adequate resources for the correct supply of personal protective equipment for operatives use whilst on site Suitable safety gloves will be assessed and made available prior to commencing work on site, this will be risked assessed Appropriate hard hat, hi visibility vest and steel toe capped boots will be worn at all times whilst working within the site domain. PPE will be inspected before use by the JHC operatives, and any obvious defects observed must be reported to the site supervisor

3

3

9

1

2

3

Operatives

Cuts, abrasions, head injuries

Operatives shall respect and maintain the PPE supplied to them by their employer’s

JHC_Tesco Hove Ground Works Upgrade R1