www.marejournal.com 7 The FAVORITE/MOST UNIQUE GENERAL CONTRACTING PROJECT of 2012 Tishman Construction US Department of Homeland Security Consolidation Phase I-new Construction & Historic IMC Construction Endo Health Solutions World HQ New Construction - LEED Silver — 320,000 SF — Boyle Construction 21st Century Town Square Plaza Adaptive Re-use Of Existing Browneld Site Into A Park Mid Atlantic Real Estate Journal — The Best of 2012 — March 29 - April 11, 2013 — 23C
A Tishman Construction-AECOM joint venture, this project is being built on the National Historic Landmark site of the former St. Elizabeths psychiatric hospital campus in Washington, D.C. Phase 1 includes both vertical and horizontal construction involving multiple interdependent projects. The center of focus is the new U.S. Coast Guard (USCG) headquarters building, a central utility plant and parking complex, all on track for substantial completion in May 2013. In support of the USCG headquarters, Phase 1 construction also includes the renovation of six historic buildings, exten- sive perimeter security fence and gate house system, a modular utility plant, new pump house, an extensive underground utility tunnel / ductbank distribution system and power vault, new access road, new utility infrastructure, new site circulation road system and DHS.
The 320,000 square foot facility, developed by Tram- mell Crow Co. at the Atwater business park and de- signed by L2 Partridge entails two 5-story buildings overlooking Quarry Lake with a 2-story connecting link, and site work to include a 1-story parking deck for 420 cars. Due to the close proximity to the lake the project included a unique lake cooled geothermal system. Building amenities include executive ofces, full service kitchen, cafeteria, conference center and t- ness center. IMC utilized Virtual Design and Modeling to fast track the project and was able to complete both core and shell and tenant tout in 12 months.
On the grounds of the former Bethlehem Steel plant, this adaptive re-use project transforms a portion of the largest brownelds site in the country into an amphi- theater, plaza and visitor’s center. The Levitt Pavilion at SteelStacks™, hosting 2500 people on its lawn, is a state-of-the-art outdoor entertainment venue at the foot of the former blast furnaces. The 21st Century Plaza provides the unifying framework for the arts and enter- tainment district, forming a community ‘town square’ for civic events. The original 1870’s Stock House is being given a new life as the Bethlehem Landing Visitor’s Center offering amenities to visitors.
Award Winner
O wner Morphotek Inc. Construction HSC Builders & Manager
Construction Managers
Design
Arcus Design Group Architects, Inc.
Engineer Precis Engineering Photography (c) Don Pearse Photographers, Inc.
HSC Builders constructed the award winning, 60,000sf cGMP Morphotek Biotech Pilot Plant. The plant is currently under review for LEED Silver certification.
LEVITT PAVILION | BETHLEHEM, PENNSYLVANIA — National Award Winning Design —
25 Years
Construction specialist of technically challenging & logistically complex facilities Biotech Pharmaceutical Healthcare Higher Education
1988
2013
484-223-0726 | www.boyleconstruction.com LEHIGH VALLEY, PENNSYLVANIA
304 New Mill Lane, Exton, PA 19341 610.280.0200 info@hscbuilders.com www.hscbuilders.com
Made with FlippingBook - Online Brochure Maker