Jensen 2020 Vision Book

18 | 2020 VISION

CLEAR CREEK EROSION CONTROL CARSON CITY, NEVADA

This was a Nevada Department of Transportation project designed to filter stormwater along US Highway 50 between Carson City and Lake Tahoe. We built a 96” stormwater structure, manholes, drainage inlets, and about 100’ of 30” pipe. The structure itself is about 17’ deep, and the manholes are about 10’ deep.

Craig Schumacher, Jensen Precast Sparks Production Supervisor

Made with FlippingBook - Share PDF online