20 | 2020 VISION
LOS CERRITOS CHANNEL STORMWATER CAPTURE FACILITY LONG BEACH, CALIFORNIA We designed and manufactured a system that takes in 166 cubic feet of stormwater per second through a precast concrete flow splitting structure into dual hydrodynamic separator units deployed inside two 16-foot diameter precast concrete structures.
Walter Stein, Jensen Precast Stormwater Systems Manager
Made with FlippingBook - Share PDF online