Wake County Hazard Mitigation Plan - January 2020

SECTION 4: RISK ASSESSMENT

PULSTAR research reactor at North Carolina State University. Table 4.92 lists emergency declarations reported in the 2015 Wake County Multi-Jurisdictional Hazard Mitigation Plan. Table 4.92 – Emergency Declarations at Harris Nuclear Plant, 1986 – 2015

Emergency Declaration

Date

Description

Loss of greater than 50% of main control board (MCB) alarms due to electrical problems; normal power supply to annunciator panel failed and did not transfer to its backup inverter. Fire on “B” Main Electrical Transformer; release of flammable gas in the Protected Area. Loss of ERFIS computer system to display Safety Parameter Display System (SPDS) (55 lapsed minutes). Loss of ERFIS computer system to display SPDS (58 lapsed minutes). Loss of ERFIS computer system to display SPDS (48 lapsed minutes). Loss of ERFIS computer system to display SPDS (27 lapsed minutes). Safety Injection (an Emergency Core Cooling System) actuated while testing electronic circuitry. Loss of ERFIS computer system to display SPDS (23 lapsed minutes). Loss of ERFIS computer system to display SPDS (22 lapsed minutes). Loss of ERFIS computer system to display SPDS (32 lapsed minutes). Loss of ERFIS computer system to display SPDS (28 lapsed minute). Fire within the Protected Area greater than 10 minutes; smoke observed coming from the motor for the reactor auxiliary building supply fan. RCS leakage in excess of Tech Specs (unidentified leakage > 1.0 gpm). RCS leakage in excess of Tech Specs; pressure operated relief valve opened and admitted RCS inventory to the pressurized relief tank (PRT).

Alert

08/12/1988

Alert

10/09/1988

Unusual Event 11/28/1986

Unusual Event 11/29/1986 Unusual Event 11/30/1986 Unusual Event 12/03/1986

Unusual Event 12/11/1986

Unusual Event 01/27/1987 Unusual Event 07/11/1987 Unusual Event 07/24/1987 Unusual Event 07/25/1987

Unusual Event 02/04/1988

Unusual Event 10/06/1988

Unusual Event 10/20/1988

Unusual Event 11/17/1988

Loss of ERFIS computer system to display SPDS for > 60 minutes.

Reactor coolant system (RCS) leakage in excess of Tech Specs (unidentified leakage > 1.0 gpm). High level alarm on radiological effluent release monitor the (Treated Laundry and Hot Shower high level alarm was set just above background).

Unusual Event 12/01/1988

Unusual Event 12/16/1988

Unusual Event 03/13/1989

Loss of ERFIS computer system to display SPDS for > 60 minutes.

Plant shutdown required by Technical Specifications. Excessive leakage of a containment penetration; leakage discovered during surveillance testing.

Unusual Event 01/24/1991

Unusual Event 02/15/1991

Loss of ERFIS computer system to display SPDS for > 4 hours.

Plant shutdown required by Technical Specifications (testing of “A” Reactor Coolant Pump (RCP) electrical protection function).

Unusual Event 03/05/1991

Unusual Event 04/14/1992 Unusual Event 02/06/1993 Unusual Event 02/17/1994

Loss of ERFIS computer system to display SPDS for > 4 hours. Loss of ERFIS computer system to display SPDS for > 4 hours. Loss of ERFIS computer system to display SPDS for > 4 hours.

Loss of both emergency diesel generators - “B” diesel generator was being worked on; in accordance with test procedures, “A” diesel generator is required to be tested within 24 hours following having redundant diesel out-of-service; did not pass test. Unplanned emergency core cooling system (ECCS) discharge to the reactor vessel; reactor trip and safety injection (SI) occurred during the performance of testing. Train derailment on site - while removing empty cask car from the Protected Area, the rail cars were moved onto the Engine Spur to allow passage of the CSX engine on adjacent Plant Spur; cask car shifted; 4 wheels of the car left the rails.

Unusual Event 07/22/1994

Unusual Event 11/05/1995

Unusual Event 12/14/1995

Wake County Multi-Jurisdictional Hazard Mitigation Plan 2019

198

Made with FlippingBook - professional solution for displaying marketing and sales documents online