SECTION 5: CAPABILITY ASSESSMENT
Floodplain Management Plan A floodplain management plan (or a flood mitigation plan) provides a framework for action regarding corrective and preventative measures to reduce flood-related impacts. 11 of the 13 participating jurisdictions have a floodplain management plan in place. Open Space Management Plan An open space management plan is designed to preserve, protect, and restore largely undeveloped lands in their natural state, and to expand or connect areas in the public domain such as parks, greenways, and other outdoor recreation areas. In many instances open space management practices are consistent with the goals of reducing hazard losses, such as the preservation of wetlands or other flood-prone areas in their natural state in perpetuity. 12 of the 13 participating jurisdictions have an open space management plan in place or under development. Stormwater Management Plan A stormwater management plan is designed to address flooding associated with stormwater runoff. The stormwater management plan is typically focused on design and construction measures that are intended to reduce the impact of more frequently occurring minor urban flooding. 13 of the 13 participating jurisdictions have a stormwater management plan in place. 5.3.2 Administrative and Technical Capability The ability of a local government to develop and implement mitigation projects, policies, and programs is directly tied to its ability to direct staff time and resources for that purpose. Administrative capability can be evaluated by determining how mitigation-related activities are assigned to local departments and if there are adequate personnel resources to complete these activities. The degree of intergovernmental coordination among departments will also affect administrative capability for the implementation and success of proposed mitigation activities. Technical capability can generally be evaluated by assessing the level of knowledge and technical expertise of local government employees, such as personnel skilled in using geographic information systems (GIS) to analyze and assess community hazard vulnerability. The Local Capability Self-Assessment was used to capture information on administrative and technical capability through the identification of available staff and personnel resources. Table 5.3 provides a summary of the Local Capability Self-Assessment results for the region with regard to relevant staff and personnel resources. A checkmark indicates the presence of a staff member(s) in that jurisdiction with the specified knowledge or skill.
Wake County Multi-Jurisdictional Hazard Mitigation Plan 2019
218
Made with FlippingBook - professional solution for displaying marketing and sales documents online