Wake County Hazard Mitigation Plan - January 2020

SECTION 7: MITIGATION ACTION PLANS

Table 7.5 – Mitigation Action Plan, Town of Fuquay-Varina

Town of Fuquay-Varina

Relative Priority

Lead Agency/ Department

Potential Funding Sources

Implementation Schedule

Action #

Description

Goal Objective

Hazard(s) Addressed

Estimated Cost

2019 Status

Status Comments/Explanation

Prevention

Require pre and post construction certification for residential lot development within 10 feet of Wake County Flood Hazard Soils. Annually calculate acreage of flood prone property preserved as open space. Map storm water drainage system as part of Phase II Stormwater Management Plan. Provide for public dissemination building inspections brochures regarding high winds, water damage prevention, and tie downs for accessory structures. Review and update of drought policy for water conservation Review and update requirements for mast arms to be installed over strain poles Review and update the 2014 Comprehensive Systemwide Parks, Recreation & Cultural Resources Master Plan for inclusion of hazard safety information at facilities Continue to enforce the Flood Damage Prevention Ordinance for all new construction or substantial building rehabilitations. Require minimum finished floor elevation in known FEMA flood hazard zones be minimum 2’ above base flood elevation. Identify and inventory buildings that are located in FEMA flood zones to determine which structures may be prone to flooding (possible relocation and/or elevation). Work with the U.S. Army Corps of Engineers on wetland protection. Use Open Space Ordinance to protect wildlife habitat. Notify Wake County of any illegal stream dumping instances Enforce standards for tree protection and control of clear cutting (Town has received legislative authority to enact tree protection and control of clearcutting standards.) Install low flow/high efficiency toilets at new town hall

Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years

In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward

P-1

4

1

Flood

Moderate

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

Part of permit review process

P-2

2

2

Flood, Hurricane

Moderate

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

Part of an annual report

Fuquay-Varina Engineering Fuquay-Varina Inspections

Part of infrastructure acceptance / ongoing project to work on historical data inclusion Brochures continuously made available to public at Town Hall

P-3

2

2

Flood

High

Budgeted Staff Time

Annual Budget

Flood, Tornado, Hurricane, Severe Weather

P-4

1

1

Moderate

Budgeted Staff Time

Annual Budget

P-5

2

2

Drought

High

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

3-5 years

New

N/A

Severe Weather, Severe Winter Storm, Hurricane, Tornado Flood, Earthquake, Extreme Heat, Severe Weather, Tornado

P-6

3

2

Moderate

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

3-5 years

New

N/A

Fuquay-Varina Planning and Parks, Recreation, & Cultural Resources

P-7

4

2

High

Budgeted Staff Time

Annual Budget

3-5 years

New

N/A

Property Protection

Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years

In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward

Part of development and permit review process Part of development and permit review process We reference the Dept of Public Safety's report Part of development and permit review process Part of development and permit review process Continued function of normal operation

PP-1

4

1

Flood, Hurricane

High

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

Fuquay-Varina Planning and Inspections Fuquay-Varina Planning and Engineering

PP-2

4

1

Flood, Hurricane

High

Budgeted Staff Time

Annual Budget

PP-3

3

1

Flood, Hurricane

High

Budgeted Staff Time

Annual Budget

Natural Resource Protection

NRP-1

4

1

Flood, Hurricane

Moderate

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

NRP-2

4

1

All

Moderate

Fuquay-Varina Planning Fuquay-Varina Planning and Public Utilities

Budgeted Staff Time

Annual Budget

Flood, Dam Failure, Hurricane

NRP-3

3

1

Moderate

Budgeted Staff Time

Annual Budget

Part of development and permit review process

Flood, Wildfire, Landslide

NRP-4

4

1

High

Fuquay-Varina Planning

Budgeted Staff Time

Annual Budget

NRP-5

3

1

Drought

Low

All Departments

To Be Determined

Annual Budget

1 year

New

N/A

Structural Projects

S-1 S-2

Install a generator at the new town hall Install security cameras on new town hall

3 3

1 1

All

High High

All Departments All Departments

To Be Determined To Be Determined

Annual Budget Annual Budget

1 year 1 year

New New

N/A N/A

Terrorism

Emergency Services

Maintain current warning system with local sirens on elevated platforms and use of the Emergency Broadcast System. Coordinate an incident command course for all Town employees, related to Emergency Operations Plan and Disaster Operations Plan for the Town.

Fuquay-Varina Planning, Fire and Police

Ongoing - Next 5 Years Ongoing - Next 5 Years

In-Progress – Carry Forward In-Progress – Carry Forward

ES-1

1

2

All

High

Continued function of normal operation

Budgeted Staff Time

Annual Budget

Lack of staffing has prevented implementation

Fuquay-Varina Fire and Police

ES-2

2

1

All

Moderate

Budgeted Staff Time

Annual Budget

Wake County Multi-Jurisdictional Hazard Mitigation Plan 2019

240