SECTION 7: MITIGATION ACTION PLANS
Table 7.7 – Mitigation Action Plan, Town of Holly Springs
Town of Holly Springs
Potential Funding Sources
Hazard(s) Addressed
Relative Priority
Lead Agency/ Department
Implementation Schedule
Action #
Description
Goal Objective
Estimated Cost
2019 Status
Status Comments/Explanation
Prevention
Vision Holly Springs Comprehensive Plan - The Town has an existing Comprehensive Plan which includes Land Use, Parks and Recreation, Public Safety, Economic Development, Transportation, Public Utilities and Environment. This plan includes past and current conditions and sets goals for future needs of the Town. The Hazard Mitigation Plan will be incorporated as an additional component of the CGP at plan update. 4
Holly Springs Planning & Zoning
To be determined
In-Progress – Carry Forward To be updated in 2019
P-1
2
All
Moderate
Local
1 year
Update Floodplain Development Regulations - The Town has an ordinance developed to minimize public and private losses due to flood conditions. The latest update of the Flood Damage Prevention Ordinance was May 2, 2006. (00-23). Implement Floodplain Development Regulations related to participating in the National Flood Insurance Program Floodplain Development Regulations - The Town has been a participating member of the National Flood Insurance Program since 1992, The Town evaluated the Town’s potential participation in the Community Rating System (CRS) and determined that the amount of insured properties in the Town did not warrant participation in the CRS. However, staff will reevaluate this determination in the future through the implementation of the Floodplain Management Program. Water Emergency Response Plan - Develop Water Emergency Response Plan in accordance with EPA mandate with wastewater emergency plan developed voluntarily.
Holly Springs Engineering
In-Progress – Carry Forward
Ordinance will be updated once the preliminary maps under review by FEMA/NCDEM are adopted
4
1
Flood
High
P-2
No cost
Local
3-5 Years
The Town restricts or prohibits uses which are dangerous to health, safety and property due to water or erosion hazards or which result in damaging increases in erosion or in flood heights or velocities. (00-23)
Holly Springs Engineering
Not Started – Carry Forward
P-3
4
1
Flood
High
Staff time
Local
2-3 years
Holly Springs Engineering
To be determined
Ongoing - Next 5 Years
In-Progress – Carry Forward Re-evaluate potential for CRS participation
P-4
4
1
Flood
High
Local
Holly Springs Public Utilities, Engineering
To be determined
Plan review and update will ensure secondary water sources available during an emergency
In-Progress – Carry Forward
P-5
3
2
All
High
Local
3-5 years
Property Protection
Building Acquisition and Clearance - The Town is willing to develop a plan designed to utilize Federal grant resources to assist private property owners in purchasing properties located in flood hazard zones. 3 Building Relocation - The Town is willing to develop a plan designed to utilize Federal grant resources to assist private property owners in relocating existing structures out of flood hazard zones. 3 Building Retrofit - The Town is willing to develop a plan to utilize Federal grant resources to assist private property owners in renovating and retrofitting existing structures in flood hazard zones to reduce vulnerability to flooding damage. 3 Purchase of Open Space, Parks and Greenways - The Parks and Recreation Department is asking for $500,000 for Capital Improvement Projects to purchase open space. The Town also works with Wake County and other agencies to find other funding for open space acquisition. Once funds are obtained the Town will acquire land consistent with Land Use and Master Open Space Plans. 4 Backup Power to Fire and Police Stations – The Town provides backup power to all fire and police stations. Fire Station 1 – backup power provided by a grant; backup power to Fire Station 2 and Fire Station 3 and Police Station provided by local funds. 3
Staff time; acquisition costs TBD on case by case basis Staff time; relocation costs TBD on case by case basis Staff time; retrofitting costs TBD on case by case basis
Holly Springs Code Enforcement Holly Springs Code Enforcement Holly Springs Code Enforcement
Local, State, Federal
Not Started – Carry Forward Target for development of plan to enable this activity is now 2019-2021
PP-1
2
Flood
Low
2-3 years
Local, State, Federal
Not Started – Carry Forward Target for development of plan to enable this activity is now 2019-2021
PP-2
2
Flood
Low
2-3 years
Local, State, Federal
Not Started – Carry Forward Target for development of plan to enable this activity is now 2020-2021
PP-3
2
Flood
Low
2-3 years
Holly Springs Parks and Recreation
County & State Agencies
PP-4
2
Flood
Moderate
Land Cost
More than 5 years In-Progress – Carry Forward Continually seeks new investments
Requires new facility. Cost unknown at this time.
Local, Federal
In-Progress – Carry Forward Plans to be developed to establish backup power for Fire Station #3.
Holly Springs Public Safety
3-5 Years
PP-5
1
All
High
Wake County Multi-Jurisdictional Hazard Mitigation Plan 2019
244
Made with FlippingBook - professional solution for displaying marketing and sales documents online