Require pre and post construction certification for residential lot development within 10 feet of Wake County Flood Hazard Soils. Annually calculate acreage of flood prone property preserved as open space. Map storm water drainage system as part of Phase II Stormwater Management Plan. Provide for public dissemination building inspections brochures regarding high winds, water damage prevention, and tie downs for accessory structures. Review and update of drought policy for water conservation Review and update requirements for mast arms to be installed over strain poles Review and update the 2014 Comprehensive Systemwide Parks, Recreation & Cultural Resources Master Plan for inclusion of hazard safety information at facilities Continue to enforce the Flood Damage Prevention Ordinance for all new construction or substantial building rehabilitations. Require minimum finished floor elevation in known FEMA flood hazard zones be minimum 2’ above base flood elevation. Identify and inventory buildings that are located in FEMA flood zones to determine which structures may be prone to flooding (possible relocation and/or elevation).
Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time
Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years
In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward
P-1
4
1
Flood
Moderate
Fuquay-Varina Planning
Annual Budget
Part of permit review process
P-2
2
2
Flood, Hurricane
Moderate
Fuquay-Varina Planning
Annual Budget
Part of an annual report
Part of infrastructure acceptance / ongoing project to work on historical data inclusion Brochures continuously made available to public at Town Hall
P-3
2
2
Flood
High
Fuquay-Varina Engineering
Annual Budget
Flood, Tornado, Hurricane, Severe Weather
P-4
1
1
Moderate
Fuquay-Varina Inspections
Annual Budget
P-5
2
2
Drought
High
Fuquay-Varina Planning
Annual Budget
3-5 years
New
N/A
Severe Weather, Severe Winter Storm, Hurricane, Tornado Flood, Earthquake, Extreme Heat, Severe Weather, Tornado
P-6
3
2
Moderate
Fuquay-Varina Planning
Annual Budget
3-5 years
New
N/A
Fuquay-Varina Planning and Parks, Recreation, & Cultural Resources
Budgeted Staff Time
P-7
4
2
High
Annual Budget
3-5 years
New
N/A
Property Protection
Budgeted Staff Time
Ongoing - Next 5 Years
In-Progress – Carry Forward
Part of development and permit review process
PP-1
4
1
Flood, Hurricane
High
Fuquay-Varina Planning
Annual Budget
Fuquay-Varina Planning and Inspections
Budgeted Staff Time
Ongoing - Next 5 Years
In-Progress – Carry Forward
Part of development and permit review process
PP-2
4
1
Flood, Hurricane
High
Annual Budget
Fuquay-Varina Planning and Engineering
Budgeted Staff Time
Ongoing - Next 5 Years
In-Progress – Carry Forward
We reference the Dept of Public Safety's report
PP-3
3
1
Flood, Hurricane
High
Annual Budget
Natural Resource Protection
Work with the U.S. Army Corps of Engineers on wetland protection.
Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time Budgeted Staff Time
Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years Ongoing - Next 5 Years
In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward In-Progress – Carry Forward
Part of development and permit review process Part of development and permit review process
NRP-1
4
1
Flood, Hurricane
Moderate
Fuquay-Varina Planning
Annual Budget
NRP-2
Use Open Space Ordinance to protect wildlife habitat.
4
1
All
Moderate
Fuquay-Varina Planning
Annual Budget
Notify Wake County of any illegal stream dumping instances Enforce standards for tree protection and control of clear cutting (Town has received legislative authority to enact tree protection and control of clearcutting standards.) Install low flow/high efficiency toilets at new town hall
Flood, Dam Failure, Hurricane
Fuquay-Varina Planning and Public Utilities
NRP-3
3
1
Moderate
Annual Budget
Continued function of normal operation
Flood, Wildfire, Landslide
Part of development and permit review process
NRP-4
4
1
High
Fuquay-Varina Planning
Annual Budget
NRP-5
3
1
Drought
Low
All Departments
To Be Determined
Annual Budget
1 year
New
N/A
Structural Projects
S-1 S-2
Install a generator at the new town hall Install security cameras on new town hall
3 3
1 1
All
High High
All Departments All Departments
To Be Determined To Be Determined
Annual Budget Annual Budget
1 year 1 year
New New
N/A N/A
Terrorism
Emergency Services
Maintain current warning system with local sirens on elevated platforms and use of the Emergency Broadcast System.
Fuquay-Varina Planning, Fire and Police
Budgeted Staff Time
Ongoing - Next 5 Years
In-Progress – Carry Forward
ES-1
1
2
All
High
Annual Budget
Continued function of normal operation