Wake County Hazard Mitigation Plan - January 2020

SECTION 1: REGULATION CHECKLIST

INSTRUCTIONS: The Regulation Checklist must be completed by FEMA. The purpose of the Checklist is to identify the location of relevant or applicable content in the Plan by Element/sub-element and to determine if each requirement has been ‘Met’ or ‘Not Met.’ The ‘ Required Revisions ’ summary at the bottom of each Element must be completed by FEMA to provide a clear explanation of the revisions that are required for plan approval. Required revisions must be explained for each plan sub- element that is ‘Not Met.’ Sub - elements should be referenced in each summary by using the appropriate numbers (A1, B3, etc.), where applicable. Requirements for each Element and sub-element are described in detail in this Plan Review Guide in Section 4, Regulation Checklist.

1. REGULATION CHECKLIST

Location in Plan (section and/or page number)

Not Met

Regulation (44 CFR 201.6 Local Mitigation Plans)

Met

ELEMENT A. PLANNING PROCESS

Section 2 (p. 4-23)  Section 1, p2

A1. Does the Plan document the planning process, including how it was prepared and who was involved in the process for each jurisdiction? (Requirement §201.6(c)(1)) A2. Does the Plan document an opportunity for neighboring communities, local and regional agencies involved in hazard mitigation activities, agencies that have the authority to regulate development as well as other interests to be involved in the planning process? (Requirement §201.6(b)(2)) A3. Does the Plan document how the public was involved in the planning process during the drafting stage? (Requirement §201.6(b)(1)) A4. Does the Plan describe the review and incorporation of existing plans, studies, reports, and technical information? (Requirement §201.6(b)(3)) A5. Is there discussion of how the community(ies) will continue public participation in the plan maintenance process? (Requirement §201.6(c)(4)(iii)) A6. Is there a description of the method and schedule for keeping the plan current (monitoring, evaluating and updating the mitigation plan within a 5-year cycle)? (Requirement §201.6(c)(4)(i))

X

Section 2 (p. 7-8, 14); Appendix B (p.B.46-

B.47)  P10-11

X

Section 2 (p. 13-14); Appendix B (p.B.24- B.45)  Section 2, p10 Section 2 (p. 7-8)  P257

X

X

Section 8 (p. 260) 

X

Section 8 (p. 256- 260) 

X

ELEMENT A: REQUIRED REVISIONS NCEM has reviewed Elements A1, A2, A3, A4, A5, A6 and the plan appears to meet all Planning Process requirements..

ELEMENT B. HAZARD IDENTIFICATION AND RISK ASSESSMENT

A-2

Local Mitigation Plan Review Tool