Wake County Hazard Mitigation Plan - January 2020

1. REGULATION CHECKLIST

Location in Plan (section and/or page number)

Not Met

Regulation (44 CFR 201.6 Local Mitigation Plans) B1. Does the Plan include a description of the type, location, and extent of all natural hazards that can affect each jurisdiction(s)? (Requirement §201.6(c)(2)(i))

Met

Section 4.5 (p. 61-209; Hazard Description, Location, Extent, Hazard Summary by Jurisdiction), Annex A- M  Section 4.5 (p. 61-209; Past Occurrences, Probability of Future Occurrence, Hazard Summary by Jurisdiction),  Section 4.5 (p. 61-209; Vulnerability Assessment, Hazard Summary by Jurisdiction), Annex A- M  Pp 33-40, overall impact P 48

X

B2. Does the Plan include information on previous occurrences of hazard events and on the probability of future hazard events for each jurisdiction? (Requirement §201.6(c)(2)(i))

X

B3. Is there a description of each identified hazard’s impact on the community as well as an overall summary of the community’s vulnerability for each jurisdiction? (Requirement §201.6(c)(2)(ii))

X

B4. Does the Plan address NFIP insured structures within the jurisdiction that have been repetitively damaged by floods? (Requirement §201.6(c)(2)(ii))

Section 4.5.5 (p.113) 

X

ELEMENT B: REQUIRED REVISIONS NCEM has reviewed Elements B1, B2, B3, B4 and the plan appears to meet all Hazard Identification and Risk Assessment requirements.

ELEMENT C. MITIGATION STRATEGY

C1. Does the plan document each jurisdiction’s existing authorities, policies, programs and resources and its ability to expand on and improve these existing policies and programs? (Requirement §201.6(c)(3)) C2. Does the Plan address each jurisdiction’s participation in the NFIP and continued compliance with NFIP requirements, as appropriate? (Requirement §201.6(c)(3)(ii)) C3. Does the Plan include goals to reduce/avoid long-term vulnerabilities to the identified hazards? (Requirement §201.6(c)(3)(i)) C4. Does the Plan identify and analyze a comprehensive range of specific mitigation actions and projects for each jurisdiction being considered to reduce the effects of hazards, with emphasis on new and existing buildings and infrastructure? (Requirement §201.6(c)(3)(ii)) C5. Does the Plan contain an action plan that describes how the actions identified will be prioritized (including cost benefit review), implemented, and administered by each jurisdiction? (Requirement §201.6(c)(3)(iv)); (Requirement §201.6(c)(3)(iii))

Section 5 (p. 210- 225) 

X

Section 5 (p. 216-217) P108, 217

X

Section 6 (p.226- 228) 

X

Section 6 (p. 229-230), Section 7 (p. 231- 255) 

X

Section 6 (p. 229-230), Section 7 (p. 231- 255) 

X

Local Mitigation Plan Review Tool

A-3

Made with FlippingBook - professional solution for displaying marketing and sales documents online