PPA | 29 Station Road, Backwell, BS48 3NH

29 Station Road, Backwell PROFESSIONAL PLANNING APPRAISAL

5.11 Secure and fully enclosed cycle storage in a convenient/accessible location will be

required. Garages that comply with the size requirements can be used for cycle

parking.

5.12 The scheme will need to comply with the Nationally Described Space Standard

(Technical Housing Standards); and provide refuse/recycling storage.

5.13 Windows to habitable rooms in the side elevations should be avoided.

Application Report/Survey Requirements

5.14 This is likely to include:

▪ A drainage scheme (Sustainable Urban Drainage);

▪ An Energy Strategy demonstrating that the scheme would deliver 10% of the

predicted energy use through renewable energy sources;

▪ A tree survey, arboricultural implications assessment, method statement, and

tree protection plan;

▪ Ecological Surveys (a Phase 1 survey and potentially protected species

surveys – these would need to be undertaken between May and

September);

Coal Mining Risk Assessment.

6. SKETCH BLOCK PLAN

TO FOLLOW

7 | P a g e

Made with FlippingBook - Online catalogs