NIBuilder 32-3

PROJECT

EOS ITSOLUTIONSHEADOFFICE, BANBRIDGE

STAIRS AND METALWORK A .C.T fabricated the stairs and metalwork for the landmark EOS IT Solutions Head Office in Banbridge.

range of materials, including stainless steel, mild steel and aluminium to provide a top quality service of the highest standards using laser cutting, machining and welding solutions for customers across the UK and Ireland. Their skilled welders are coded to BS EN ISO 9606- 1:2013 in both TIG and MIG welding. This provides peace of mind that when they undertake a job you know you will get the very best. All welders go through stringent

Specifically, A.C.T designed and manufactured the balcony, handrails, staircase and fire staircase at the rear of the building. The highly skilled A.C.T team works with a

qualifications and re-qualifications every two years to keep up to the mark; these qualifications are x-rayed and mechanically tested to ensure they meet the current required code. For further information on A.C.T’s services, products and design work, don’t hesitate to contact a member of their team.

T: +44 (0)28 4023 8042 E: info@a-c-technology.com www.a-c-technology.com

M+E CONSULTANTS B ailie Associates were tasked with providing M+E services for the state-of-the-art EOS IT Solutions conditioning company and a system of UV lights were designed

and integrated into the system.” Electrically the project incorporated a high integrity power supply system designed by Ian Corbett Electrical Director of Bailie Associates, with UPS, generator and no break automatic change over switch, which was essential for maintaining power to the clients IT services.

Head Office building to include energy efficient systems for a densely occupied space containing a high element of IT. The project required close collaboration during design for M+E services with a number of unique features and requests to plan for. Gavin Hewitt, Mechanical Director of Bailie Associates explained further, “Each floor is provided with its own independent flexible floor air conditioning system, utilising a cabinet style air conditioning unit to provide conditioned air to the raised floor plenum, with a number of floor terminal units.” During the installation the client requested that the ventilation/air conditioning system was future proofed to cover for covid-19 requirements. “On this basis, research was carried out between ourselves and the air

Commenting on the project, Gavin said, “Killowen Contracts were an excellent building company to have been involved with. They were proactive on site with coordinating their sub contracts and when any difficulties arose, a solution was never far from being found.”

T: +44 (0)28 9260 2692 E: info@bailieassociates.com www.bailieassociates.com

88 | NI BUILDER

FOLLOW US ON:

www.northernbuilder.co.uk

Made with FlippingBook - professional solution for displaying marketing and sales documents online