ECS-SIS Insulated Cladding Installation

BACK VIEW

Urethane caulking on outside of top and bottom tracks or foam gasket between track and panels

A foamboard adhesive is used at all joints to bond the panels together and provide a water resistant barrier

ROK-ON™ Panel 12mm MAGBOARD™ facing outside and 6mm MAGBOARD™ facing inside

Drywall installed according to product specifications and installation guidelines

Typical steel frame 16” O.C.

Starter Strip / Fire Stop

3” wide 12mm MAGBOARD™ strip placed with Peel and Stick and T-nailed or stapled in place 8” O.C. to seal the seam and fire protect the joint.

Urethane caulking on outside of top and bottom tracks of foam gasket between track and panels

Minimum on inch polyurethane insulation air barrier system to seal and strengthen the wall assembly. Actual insulation will be according to design specifications

(see fastener specifications)

BENEFITS

FEATURES

ATTACHES TO THE STUDS LIKE REGULAR SHEATHING

USE COMMON TOOLS/FASTENERS. NO SPECIAL TRADES

FEWER LAYERS, LESS STEPS THAN MOST COMPETING SYSTEMS

FEWER SUBS, QUICKER OCCUPANCY

NO ADDT’L LAYERS NEEDED TO PROTECT IT. ARCHITECTURAL FLEXIBILITY

DIRECT APPLICATION OF FINISHES ROK-ON™ IS A SCREW BASE

ALL JOINTS FORWARD FACING

FEWER INSPECTIONS

NO CHANCE FOR WATER TO ENTER ENVELOPE TO ROT OR RUST STUDS

DEWPOINT MOVES OUTSIDE THE WALL CAVITY

LOWER LONG-TERM OPERATING AND MAINTENANCE COSTS. FEWER CALL BACKS

BETTER PERFORMANCE THAN COMPETING SYSTEMS AT SIMILAR COST

ECSM Small House Product Guide ECSM Small House Product Guide

Document ID: SHPG070117

Document ID: SHPG070117

Made with FlippingBook Online newsletter