Commissioning – planning and supervision Independent commissioning to manage risk and assure performance

PROJECT CHALLENGES

HOW SGS SUPPORTS

BENEFITS

• Independent commissioning management and technical assurance • Verification of installation quality against design, codes, and standards

• Complex, fast-track data center builds with zero tolerance for failure • Assurance of critical MEP, power, cooling, and life-safety systems • Managing commissioning risk across multiple contractors and vendors • Meeting regulatory, insurer, and investor requirements • Achieving predictable, on-time go-live without late-stage surprises

• Safer construction sites • Verified installation quality • Reliable commissioning and system performance • Predictable, risk-free handover

• Integrated testing and validation (FAT, SAT, IST, site acceptance)

• Risk-based commissioning aligned with hyperscaler and international standards • End-to-end commissioning supervision from factory to site (Levels 1–4) • System performance and operational readiness verification (Level 5)