ISD Staff Newsletter Issue 4 May 2018

ISD

Staff Newsletter

Newsletter at a glance

Newsletter 4 { May 2018

Trial of CQCommand SMS capability ISD is working with ITS and RiskLogic to test the SMS capability within CQCommand.

ISD Planning Days Reminder

What I do when i’m not at work

The ISD Planning Days for 2018 have been scheduled for Wednesday 9 and Thursday 10 May 2018.

Many of you might think that Mike Bird tends to drone on a bit...

 P2

 P3

 P5

Terry Jordan is working on a project to house a multipurpose laboratory research facility for the AMC and Defence Science and Technology which is part of the Department of Defence. The building that previously housed AMC’s old cavitation tunnel on the Newnham campus is being extended to create the required space. AMC Advancing in Defence Research One element of the project involves the laying of a reinforced concrete slab with an independent slab on which to conduct research without transferring vibration through the existing building. The existing overhead monorail will be extended so that the gantry crane can travel the length of the building, and a new semi-industrial chain-driven roller door will be installed to enable forklift access. External Colorbond cladding, window, doors and staircase matched to the existing building, a new driveway and minor landscaping works will contribute to a seamless addition. The project is due for completion in late May 2018 and the building will be fully operational later in the year. dvancing in Defence Research orking on a project to house a multipurpose laboratory for the AMC and Defence Science and Technology which is rtment of Defence. The building that previously housed AMC’s nnel on the Newnham campus is being extended to create the the project involves the laying of a reinforced concre e slab dent slab on which to conduct research without transferring h the existing building. The existing overhead monorail will be t the gantry crane can travel the length of the building, and a trial chain-driven roller door will be installed to enable forklift Figure 2 Mezzanine floor to continue through to new extension

nd cladding, window, doors and staircase matched to the , a new driveway and minor landscaping works will contribute dition. e for completion in late May 2018 and the building will be fully r in the year.  Forklift access to new research laboratory

 Extension under construction

 Mezzanine floor to continue through to new extension

Figure 2 Mezzanine floor to continue through to new extension

Figure 1 Forklift access to new research laboratory

Figure 3 Extension under construction

/ 1

Made with FlippingBook - Online Brochure Maker