10032026 BladeRepair_V6

Technical training

Blade Repair Standard / V5 23022026

Electrical insulating protective gloves required

Chemical protective gloves required

Additional information

This Service Work Instruction contains global documentation only.

All measurements are given in SI units (metric system).

All Joint ID definitions can be found in the related platform Maintenance Manual.

Lockout tagout (LOTO) equipment may vary due to local requirements. Apply DO-NOT-OPERATE signs correctly when used.

Ensure a safe work environment. Consider all risks when working.

Recoating Time

Actual recoating times can be shorter or longer depending on film thickness, ventilation, moisture, or other local conditions.

Surface Temperature & 50 % RH

Minimum Drying Time

Maximum Drying Time

5 °C

10 h

5 days 4 days 3 days 2 days

10 °C 20 °C 30 °C 40 °C

5 h 3 h

1.5 h 0.5 h

1 day

Table 2: Recoating Time

Curing Schedule Surface Temperature & 50 % RH

Curing Time

5 °C

20 h