Technical training
Basic Technical Training Standard / V11 10032026
The participants shall:
Engage in discussions about different tasks for preparation, pre-installation and installation of WTG at on-shore and off-shore sites
ELEMENT 7.2 - RISKS AND HAZARDS ASSOCIATED WITH MAIN COMPONENT PREPARATION, PRE-ASSEMBLY AND ASSEMBLY
Learning objective:
73) The participants can explain the risks and hazards associated with main component preparation, pre-assembly and assembly (Knowledge, intermediate level)
The instructor shall:
Explain the risks and hazards associated with:
a.
main component preparation
b.
pre-assembly of components
c.
assembly of components
d.
cleaning
Present examples from installation sites with relevant risks and hazards associated with main component preparation, pre-assembly and assembly (e.g. pictures, videos, a case or scenarios)
Divide the participants into small groups
Ask the participant groups to analyse the examples with the following aims:
a.
find the relevant risks and hazards
b. explain in their own words and share understandings about how the risk and hazards can be mitigated
Give constructive feedback on the participant groups to enable the participants to be able to explain the risks and hazards of main component preparation, pre-assembly and assembly
The participants shall:
Global Wind Organisation / www.globalwindsafety.org
235 / 396
Made with FlippingBook - PDF hosting