10032026 BTT V11

Technical training

Basic Technical Training Standard / V11 10032026

General procedures for working onsite with installation

3.2

Housekeeping

TOTAL

30 min.

4. Installation environments

4.1

Installation environments TOTAL

20 min.

5. Handling and storing

Risks and hazards associated with handling and storing

5.1

5.2

Reception/Inspection

5.3

Tools and equipment TOTAL

30 min.

6. Lifting operations

Risks and hazards associated with lifting operations TOTAL

6.1

15 min.

7. Main component

7.1

Preparation, pre-assembly and assembly

preparation, pre-assembly and assembly

TOTAL

20 min.

8. Principles of electrical

8.1

Introduction to electrical completion

completion including cable work

8.2

Examples of electrical completion

Risks and hazards associated with handling and working with cables

8.3

8.4

Different types of cables

8.5

Simple installation diagrams

8.6

Cutting and crimping cables

Marking, routing and termination of all cable types TOTAL

8.7

410 min.

9. Principles of hydraulic completion

9.1

Introduction to hydraulic completion

9.2

Examples of hydraulic completion

Risks and hazards associated with hydraulic completion TOTAL

9.3

25 min.

10. Principles of operation with external generators

10.1 Principles of yaw, rotor and blade operation with external generator

Global Wind Organisation / www.globalwindsafety.org

254 / 396

Made with FlippingBook - PDF hosting