Technical training
Basic Technical Training Standard / V11 10032026
The participants shall:
Engage in a group discussion on examples of the risks and hazards associated with handling and storing
ELEMENT 5.2 - RECEPTION/INSPECTION
Learning objectives:
41) The participants can recognise the importance of inspecting goods and components before being unloaded (Knowledge, basic level)
42) The participants can recognise the importance of notifying a supervisor about any damage found before unloading, and tag “out of service” (or “do not use” or similar) if something is broken while being used (Knowledge, basic level)
43) The participants can describe the importance of ownership by everyone on site (ownership culture) (Knowledge, basic level)
44) The participants can perform reception/inspection of goods and components (Skills, intermediate level)
The instructor shall:
Explain the responsibility and importance of inspecting goods and components before being unloaded:
a.
inspection
b.
nacelle
c.
tower sections
d.
blades
e.
hubs
f.
other goods, e.g. tower bolts, etc.
g. if any damage is found, the supervisor should be notified (a damage report could be completed by a supervisor to register the damages found)
Explain the importance of notifying a supervisor about any damage found before unloading
Global Wind Organisation / www.globalwindsafety.org
268 / 396
Made with FlippingBook - PDF hosting