Technical training
Basic Technical Training Standard / V11 10032026
Permit to work
Company:
Permit to work
Permit number:
Date:
Version:
The permit to work must match the equipment which would be used in the practical exercises
Note
Work details
Steps
Detail
1.1
Wind farm location:
WTG NO:
1.2
Equipment:
1.3
Work instruction:
1.4
Date:
Isolations
Isolation details (Clear name of the isolation and operation)
Time
Signature
Note:
Time
Signature:
One example could be: Close Valve number 5 off ☐
09:11, 14/12/2021
Jane Doe
Note:
Time:
Signature:
another example could be: Open circuit breaker 123 ☐ Apply Lockout-Tagout ☐ Test for absence of voltage ☐
09:18, 14/12/2021
Jane Doe
Time:
Signature:
Time:
Signature:
Time:
Signature:
Global Wind Organisation / www.globalwindsafety.org