Richmond Hill Multi-Use Pathway (Completed) Construction of the Richmond Hill Multi-Use Pathway was completed in 2025, transforming a former highway corridor into a safer, more accessible active transportation route for pedestrians and cyclists. The project repurposed excess roadway width along Flood-Hope Road to create a separated 3.6-metre multi-use pathway, improving east-west connectivity while supporting traffic calming and long-term transportation planning.
Completed Richmond Hill Pathway
Completed Richmond Hill Pathway
Richmond Hill Multi-Use Pathway Project
Rockfall Hazard Mitigation Planning The District also advanced critical transportation safety planning through a comprehensive rock cut assessment of three priority locations: Flood-Hope Road, Union Bar Road, and Kawkawa Lake Road. Engineering analysis identified Flood-Hope Road as the highest priority for mitigation, with recommendations including scaling, selective vegetation removal, rock bolting, and pedestrian safety measures to reduce rockfall risk along key transportation corridors.
Flood-Hope Road
29
Made with FlippingBook Digital Proposal Creator