CATERING EQUIPMENT Equipment is committed to delivering competitively priced, high-quality catering products, which are tailored to the resources of their diverse M assey Catering Equipment Ltd designed, manufactured and installed a bespoke servery counter and working commercial

catering kitchen to meet the needs of South Lake Leisure Centre visitors and staff. The specialist commercial catering equipment supplied a diverse range of high quality catering products including stainless steel benches/sinks, induction cooker, coffee machine and refrigeration. Trading since 1982, Massey Catering

range of valued customers. The company is rightly proud of the design and aesthetic appeal to the finished server counter. Philip Massey, Director for Massey Catering Equipment says, “It was important to keep the look and feel of the counter in line with the modern and innovative style of the leisure centre and we believe this was achieved with great success.”

He adds, “We have worked with Farrans before and again it was a great pleasure in partnering the company on this project to achieve the finished bespoke servery and kitchen, which no doubt will get put to its full use and potential come 2021.”

T: +44 (0)28 9261 9009 E: info@masseycatering.co.uk www.masseycatering.com

GROUNDWORKS AND CIVIL ENGINEERING

S pecialist construction company, SMC Contracts, carried out all groundworks and civil engineering works at South Lake Leisure Centre site in Craigavon. As Brendan McCullough, Managing Director for SMC Contracts explains, this was a particularly challenging site, “South Lake situated beside a lake with difficult ground conditions presented environmental, health, safety and welfare issues for us as the main groundworker. We overcame these challenges by

working closely with Farrans and implementing procedures to mitigate and minimise potential risks from these hazards. “Our extensive range of specialised plant and dedicated workforce ensured that from initial site clearance to finishing touches we always had the right personnel or machine for the job”

Commenting on the job done, Brendan says, “This was an exceptional project to work on and the finished product showcased our ability to deliver high quality work, on time within challenging environments. “Working with the Farrans team on this project has been a pleasure and we look forward to continuing working with them on future projects.”

T: +44 (0)28 3005 1555 E: info@smccontracts.com www.smccontracts.com