Case Study: ISO 7 & 8 Cleanroom Facility Client: Confidential

Oct 2023

Location: Ringaskiddy, Co. Cork Project Size: Approx. 3400m2 Duration: 17 Months

Ardmac were contracted to provide an ISO 7 & 8 cleanroom facility for a global pharmaceutical client which included the design and installation of 2.5kn/m2 modular ceilings, aluminium honeycomb core flush cGMP partitions, the integration of double flush doors and glazing, door automation and the provision of a pneumatically operated Atex interlocking door control system. The scope of responsibility also included the supply and installation of lights, terminal HEPA housings and stainless steel elements such as wall / floor protection and change area furniture. For this project, Ardmac used the latest technologies such as BIM to generate a clash free model , LEAN processes to bring value to the client and the use of integrated scheduling coupled with strong project management. As a result, this complex project was handed over on time.

45

Made with FlippingBook - professional solution for displaying marketing and sales documents online