Masterton Ultimate Inclusions

Preparation and lodging of building plans and specifications for DA or CDC development (excludes amendments)

Structural engineering fees for concrete slab

Water authority building plan approval fees for homes outside of sewer zone of influence

Provide a site specific soil and exposure classification as required by the structural engineer

A

Provide internal conduit for NBN provisioning (subject to availability)

Full scaffolding and fall protection as required by local work safety authorities to two storey section of homes only

Natural gas connection to within 8m of the home (subject to availability)

Phone cabling from meter box position to the boundary up to 75 lineal metres

Safety fabric to side elevation scaffolding (where needed) to assist with protection of neighbouring property

ULTIMATE INCLUSIONS | 31

TERMS AND CONDITIONS APPLY. SEE PAGE 35 FOR DETAILS.

Made with FlippingBook. PDF to flipbook with ease