By Ward McMasters, P.E., Earth Engineering Incorporated Site Investigation Scope of Work Less Costs Less…or Does It?
W
ith the current fast pace of development throughout our area,
surface such as urban fills, weak organic soils, clays, high groundwater, rock, etc. Not to worry, a responsibly prepared scope of work for a geotechni- cal investigation should reveal insight into most of these condi- tions. The trouble occurs when the aforementioned economic pressures create a situation in which the geotechnical firm with the smallest scope and subsequent lowest price is awarded the investigation (and often the quality control inspec- tions which is why they were motivated to undercut the scope in the beginning.) The cost implications of under
investigating a project can be tremendous. I have reviewed many reports that should have been labeled as “preliminary” but were portrayed as the com- plete investigation. Insufficient coverage due to a reduced scope of work has left critically impor- tant factors to be determined at a later time. I would contend that these unknowns leave the development in a state of financial uncertainty. Not de- fining something as simple as a rock cut can adversely affect the financial success of any project. The ability to under- stand and fully plan for these critical conditions hinges on a “responsible” scope of work. I have seen countless projects im- pacted adversely by unknown conditions that would have been recognized through even a basic scope of investigative work. Is this the fault of the developer seeking a “cheaper” investiga- tion or the engineer for offering this less than desirable scope just to win the work? This is entirely up for debate. What is not up for debate is the impact that subsurface conditions can have on a project and the clear need to define these issues at the onset of any project. In general, it is important to include test borings to deter- mine the strength of the under- lying soils. This is the first step. Test pits are great and they allow for a visual picture of the upper soils, but they don’t give you data (other than a visual evaluation) of the soil strength. Therefore, be cautious of the quickie test pit investigation in lieu of a well planned scope of work. The real point of this discussion is that geotechnical engineers across our industry are a resource that should be consulted with regarding a scope of work for any investi- gation that fits a development plan. Find someone that you trust to develop a scope of work for your project that protects you from being blindsided by unknown conditions. The finan- cial savings of a cheap investi- gation are far outweighed by the potential losses caused by unforeseen conditions. Earth Engineering Incor- porated (EEI) has conducted thousands of investigations throughout the region and we take great pride in the client first service and comprehensive engineering we put into every project. Ward McMasters, P.E. is president of Earth Engi- neering Incorporated.
it is easy to gloss over one of the most critical initial elements to the financial success of any project. The proper evaluation of the subsurface conditions and the economic impact on the project can be the difference between success and failure. Often this site investigation occurs either before or early in the project financing and hence the pressures to spend less are enticing. The trap however is the cost of under investigat- ing any site and the potential financial landmines that can
QUALITY ͻ COMMITMENT ͻ PERFORMANCE
Geotechnical Design & AnalyƐŝƐͻnvironmental Site Assessments and
www.earthengineering.com Corporate Headquarters: 610-277-0880 ͻ Lehigh Valley: 610-967-4540 Central PA: 717-697-5701 ͻ South Jersey: 856-768-1001
Made with FlippingBook Learn more on our blog