iii. All Other Zoning Districts
1. Maximum Duration. A temporary tent or canopy shall be erected for a maximum of 30 days, at which point such tent or canopy shall be removed for a minimum of 90 days prior to any reassembly, in compliance with these standards.
D. Accessory Use – Temporary Storage.
i. Purpose . Temporary accessory storage is specifically for the purpose of providing storage during the process of moving, remodeling, or residential or non-residential construction (new homes or new commercial buildings).
ii. Maximum Duration . No container unit or portable tractor-trailer shall remain on a zoning lot for more than six (6) months in a 12-month period for moving or remodeling. A container unit or portable tractor-trailer may remain on site of a residential or non-residential construction project up to 12 months. iii. Extension of Duration . If additional time is required specifically related to the completion of a residential or nonresidential construction project, an extension may be granted by the Planning Director for up to 12 additional months.
iv. Use of Parking Prohibited . Temporary accessory storage units shall not occupy approved parking spaces.
v. Maximum Size . The total aggregate of all temporary accessory storage units on site at any one (1) time shall not exceed 1,200 square feet for each residential or construction project. vi. Compliance . Upon the effective date of the Land Development Ordinance, December 30, 2016, temporary accessory storage units in violation of the Land Development Ordinance shall be brought into compliance within six (6) months, except for existing container units or portable tractor-trailers that have been in place less than six (6) months, in-which case may remain until the remaining portion of the six (6) months has expired and then must be removed, in compliance with the standards of this Subsection.
Made with FlippingBook interactive PDF creator