In FY2016, the Crime Control and Prevention District funded several facilities based projects. The table below depicts the projects.

Figure 3.30. Active Facility Projects

Active Facility Projects

Funding Source

Estimated Completion

Construct Sixth Patrol Division

CCPD

December 2017

Renovate Tactical Command Center

CCPD

March 2018

Renovate West Patrol Division

CCPD

June 2018

CCPD / Sale of 350 W. Belknap

Renovate 350 W. Belknap Basement

2017

Renovate Public Safety Complex – Admin Building and Warehouse Renovate Previous Police and Fire Training Facility (1000 Calvert)

CCPD

2017

Sale of 350 W. Belknap

2017

The Sixth Patrol Division and projects directly related to the sale of 350 W. Belknap have been discussed in other sections of this plan.

Funded – Renovation of West Patrol Division (Joyce Dr.) The purpose of this project is to renovate a city-owned facility at 3530 Joyce Drive to create suitable office space for West Patrol Division functions currently housed at a leased facility located at 5320 Trail Lake Drive. The City of Fort Worth purchased the 14,000 square foot former bank building in 2014 to replace a leased facility at Trail Lake Drive, which is located within the South Patrol Division boundary. The Trail Lake property owner indicated that he plans to redevelop the property, and as such, a consolidated West Patrol Campus, inclusive of the Joyce Drive facility located adjacent to the existing Marquita West Patrol Division facility, is a logical and viable renovation project.

The project requires extensive renovation work, including converting open space into offices, repairing, and modernizing, the existing building infrastructure to include IT, mechanical (HVAC), electrical, and plumbing systems. In 2015, a design and construction plan were completed, so minor cost adjustments for the anticipated fiscal year costs makes the project ready for construction contractor bids. This project could finalize by October 2017, funded in its entirety through the Crime Control and Prevention District. 3530 Joyce Drive Facility