Chris Grannan Client Executive | Vice President of Preconstruction, Chattanooga Office

Chris is a ten year veteran of EMJ. As Vice President of Preconstruction, Chris will provide guidance and oversight to all EMJ personnel assigned to this project, ensure our team’s services exceed the client’s expectations and will be the executive point of contact for Nokian Tyres.

Relevant Experience FedEx Ground - Chattanooga, TN: $20.8 million, 237,000 sq. ft. Development of 39 acres of 63-acre site. Balancing site to shift over 250,000 cubic yards of earth across the site. Building will be pre-engineered metal building set on shallow cast-in-place concrete foundations. Work includes off site work consisting of new traffic signals and enlarging of I-75 exit ramp and Apison Pike. Resolute Forest Products - Calhoun, TN: $10 million, 241,492 sq. ft. Construction of a new pre-engineered manufacturing facility. Shaw Tile Plant T1 – Adairsville, GA: $36.2 million, 686,668 square-foot carpet tile manufacturing facility. The facility consists of a 496,226 sq. ft. manufacturing area with a 107,506 sq. ft. warehouse and a 12,500 sq. ft. administrative annex. Exterior walls at the manufacturing and warehouse areas are plant precast attached to a structural steel frame that carries a TPO roofing system. The project is slated to achieve LEED Silver. Shaw Plant 34 Expansion – Dalton, GA: $28.7 million, 535,000 sq. ft. warehouse consisting of concrete tilt walls, structural steel, SOG with a TPO roof. Project also consisted of clearing 28 acres for the new addition along with site utility work, detention pond, RCC pavement for truck parking and site lighting. Wacker Chemical Corporation – Charleston, TN: $40 million, 324,000 sq. ft. (Office Building, Fire Station, CS Reaction, Control Center, HCL Generation, Maintenance Shop, Equipment Cleaning and Distribution Center Buildings). These buildings included large mechanical and electrical packages, super flat floor slabs, high performance coatings, installation of owner furnished equipment and deep foundations. Occidental Chemical Corporation – New Johnsonville, TN: $5.1 million, 36,000 sq. ft. Construction of three buildings to house OxyChem’s administration, laboratory, data control centers, maintenance and security operations. American Snuff – Clarksville, TN: $11.6 million, 225,000 sq. ft. Construction of a new production facility and renovating an existing 100,000 sq. ft. structure into a storage facility and operations offices. American Snuff – Memphis, TN: $11 million, 695,000 sq. ft. Construction of five phases of a multiple phase production facility project.

Career Summary • 10 years with EMJ • 23 years total experience Education • Purdue University at Indianapolis

2525

Made with FlippingBook flipbook maker