EMJ_Proposal_Nokian Tyres, Dayton, TN_RFP_060917

Chad Marler Project Engineer

As Project Engineer, Chad assists with pre-development services, takeoffs, bid solicitation, bid tabulation and conceptual budgets. He conducts reference checks, and expedites contract execution. He manages and expedites the change request process, including writing and processing change orders to subcontractors and owners; assist in the closeout process; assist in preparing submittal and delivery logs, assist in preparing for the project reviews and collection of lien waivers.

Relevant Experience Wacker Chemical Corporation – Charleston, TN: $40 million, 324,000 sq.ft. (Office Building, Fire Station, CS Reaction, Control Center, HCL Generation, Maintenance Shop, Equipment Cleaning and Distribution Center Buildings). These buildings included large mechanical and electrical packages, super flat floor slabs, high performance coatings, installation of owner furnished equipment and deep foundations. Blue Cross Blue Shield of Tennessee, Danny Thomas Building – Memphis, TN: $5.8 million. Interior and exterior renovations to existing six story office building. Replace exterior storefront and curtain wall systems, replace HVAC system with a new VRF system, replace existing lighting with efficient T8 lighting, replace existing ceilings, flooring and wall coverings. City of Chattanooga/Volkswagen - Chattanooga, TN: $60 million, 275,000 sq.ft. EMJ is acting as Construction Manager for the BSUV plant expansion. This project consists of 100,000 sq.ft. body shop expansion along with the addition of loading dock reconfiguration. In addition a technical center expansion for finished cars. This space is 25,000 sq.ft., but is located at the existing car exit of the plant. The final part of this expansion is a 150,000 sq.ft. assembly warehouse. Monroeville Mall Renovation - Monroeville, PA: $4.5 million. Renovations include: demolition and replacement of 26,000 sq.ft. of floor tile, over lay 17,000 sq.ft. of carpet on existing tile, repair and polish 96,000 sq.ft. of terazzo, painting of existing walls and ceilings, renovate three (3) public restrooms, and upgrades to the mall’s amenities. Richland Mall Renovation – Waco, TX: $5 million, 63,000 sq.ft. This renovation included new tile and carpet floor finishes throughout the mall concourse. New light fixtures were installed throughout the concourse and all of the ceilings, bulkheads, and neutral piers received new paint. New solid surface and whitewashed wood trimmed column enclosures were installed in the major courts. Whitewashed wood trimmed visual wall elements were added at the major courts. Restrooms were completely renovated. New entry features were installed at 2 of the 3 main entrances to the mall consisting of new sign elements, stucco, reflective EIFS, sidewalks and landscaping.

Career Summary • 3 years with EMJ • 11 years total experience Education • Chattanooga State JATC Electrical Apprenticeship • Associates Degree in Engineering Organizations/ Training & Certifications • 30-Hour OSHA Certified • Licensed Electrician • IBEW LU 175 Systems Technology/ Construction Management

30

Made with FlippingBook flipbook maker