/
HUH (I–Joist Applications)
Heavy Universal Hanger
Enhanced Installation – Solid Header
— Fill all red holes as indicated for this installation — All nail holes filled into solid header (including triangular) — No web stiffeners required when using same hanger/joist depth* — Top tabs to be wiped over and nailed — Min 2No fixings into rear ply and 1No fixing into front ply per leg for double headers
*Additional triangular holes into incoming joist only required for enhanced uplift. (for details see below)
Load Data
Fixings (3.4 x 35mm)
Characteristic Capacity (kN)
Solid Header
Joist Depth (mm)
Hanger Depth (mm)
Header
Incoming
Uplift
GL (Min GL28h)
LVL
Face
Top
195-200
195
20 24 24 24 30 30
6 6 6 6 6 6
4 4 4 4 4 4
3.97 3.97 3.97 3.97 3.97 3.97
29.50 29.50 29.50 29.50 29.50 29.50
29.50 29.50 29.50 29.50 29.50 29.50
220
220-235 220-235
235-245
300
300 350 400
350-360
400
Enhanced Uplift
— Fill all red holes as indicated for this installation — Fixings into the incoming joist are required to resist uplift — Increased uplift figures can be achieved by nailing the additional triangular nail holes into the incoming member – solid incoming or web stiffeners are required
Load Data
Fixings (3.4 x 35mm)
Characteristic Capacity (kN)
Hanger Depth (mm)
(Depth Dependent Only) 195 – 400
Incoming
Uplift
8
7.97
195 – 400MM
Near side
Far side
The latest most up to date version will always be online and not in print or in downloaded pdf.
65
Technical support 01592 771132 / technical@itwcp.com / https://www.itwcp-offsite.co.uk
Made with FlippingBook Annual report maker