2026-2027 Operating & Capital Improvement Budget

 Utilize cost-effective purchased imported water supplies to ensure adequate retail supplies

2025-2026 ACCOMPLISHMENTS:  Utilized the excess groundwater purchase agreement with East Orange County Water District to maximize cost savings for a portion of imported water  Replaced City controls and instrumentation at imported water connections  Evaluated a plan to update Remote Telemetry Units at imported water connections 2026-2027 GOALS:  Start project to replace Remote Telemetry Units at imported water connections  Continue preventative maintenance at imported water connections to ensure readiness for emergency use

GROUND WATER

Produce and supply domestic water to all City of Tustin Water Services customers, and comply with safe drinking water standards mandated by State and Federal regulations.

TASKS:  Produce high quality water, meeting all health and safety standards for water quality  Operate water production facilities utilizing the most cost-effective methods and practices that public safety and water demand requirements allow  Perform maintenance to minimize service interruptions and the loss of groundwater production and imported water supplies  Coordinate the design and construction of capital improvement program projects as it relates to water  Coordinate operation of water facilities with contractors during construction activities

2025-2026 ACCOMPLISHMENTS:  Maintained high water quality that met and exceeded all State and Federal standards  Completed the abandonment of the old Simon Ranch Booster Station  Completed a pump and motor replacement at Rawlings Booster Pump Station

2026-2027 GOALS:  Continue to Conduct maintenance at Rawlings Booster Pump Station, which includes pump replacements and the addition of variable frequency drives  Rehabilitation of pump and site improvements for Columbus Tustin Well

PERFORMANCE MEASURES : Performance Measure

2021-22 Actual

2022-23 Actual

2023-24 Actual

2024-25 Actual

2025-26 Estimated

Target

Water Valves Exercised Water Services Replaced Water Meters Replaced

500

552

477

656

744

500

80

97

82

59

76

80

300

329

301

100

118

300

State Compliance Reporting Submitted Timely Water Quality Samples Collected and Analyzed

20

20

22

20

20

20

1,585

1,585

1,528

2,064

1,585

1,585

108|Page

Made with FlippingBook - professional solution for displaying marketing and sales documents online