TREX SIGNATURE ® MESH STAIR RAILING Installation Instructions
HOW TO INSTALL STANDARD MESH STAIR RAILING/ CONTINUED
44
45
42
44. A ttach bottom stair rail to bottom stair brackets using two #10 x 1” self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED IN HORIZONTAL MOUNTING KITS. 45. Attach top stair rail to top stair brackets using two #10 x 1” self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED IN HORIZONTAL MOUNTING KITS. Attachment of Bracket Covers, Skirts, and Caps
42. .Drop assembled stair mesh rail panel into brackets. E nsure that rails are fully seated into brackets and verticals are completely seated on rails. Installing Snap-in Channel Filler
47
46
Signature Post
43
46. Attach corresponding bracket covers over opening in upper and bottom rails. 47. Attach provided post skirt to bottom of posts when using Trex Signature ® posts.
48
49
Post Sleeve
Signature Post
43. Cut snap-in channel filler to correct length and install into channels of bottom and top stair rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap-in pieces with a miter saw. Use an angle grinder or hack saw only.
48. Attach post caps to Trex Signature ® posts. (Use of rubber mallet may be required for secure attachment.) 49. Attach post caps to post sleeves using external- grade PVC construction adhesive (apply adhesive on the inside self-centering/ corner tabs).
12
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TSMSR-0426
Made with FlippingBook Digital Publishing Software