Trex Signature® Mesh Railing Installation Instructions

TREX SIGNATURE ® MESH STAIR RAILING Installation Instructions

HOW TO INSTALL STANDARD MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®

D-Top Rail TOP POST LOCATION Measuring for L-Brackets

Completing L-Bracket Attachments

28

D

26

3

28. Remove the two screws from the brackets that were previously installed in step 9. Remove the railing assembly from the post brackets.

26. Insert L-bracket into vertical and place bracket into channel of top rail. Ensure that vertical is seated fully

29

Top View

flush with top rail, bracket is in the channel, and vertical is aligned with mark on rail.

B

27. M ark location for screw attachments in channel of top rail. Make sure to mark the placement of the screw holes. DO NOT attach L-bracket at this point.

27

D

29. Lay railing assembly on large, flat, clean surface. Install remaining L-brackets for section B and section D into rails where marked using remaining #8 x 5/8” flat head screws (provided) . Before attachment, verify that verticals align properly with marks.

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TSMSR-0125

Made with FlippingBook Digital Publishing Software