TREX SIGNATURE ® MESH STAIR RAILING Installation Instructions
HOW TO INSTALL STANDARD MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®
D-Top Rail TOP POST LOCATION Measuring for L-Brackets
Completing L-Bracket Attachments
28
D
26
3
28. Remove the two screws from the brackets that were previously installed in step 9. Remove the railing assembly from the post brackets.
26. Insert L-bracket into vertical and place bracket into channel of top rail. Ensure that vertical is seated fully
29
Top View
flush with top rail, bracket is in the channel, and vertical is aligned with mark on rail.
B
27. M ark location for screw attachments in channel of top rail. Make sure to mark the placement of the screw holes. DO NOT attach L-bracket at this point.
27
D
29. Lay railing assembly on large, flat, clean surface. Install remaining L-brackets for section B and section D into rails where marked using remaining #8 x 5/8” flat head screws (provided) . Before attachment, verify that verticals align properly with marks.
8
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TSMSR-0125
Made with FlippingBook Digital Publishing Software