Trex Signature® Mesh Railing Installation Instructions

HOW TO INSTALL RAILING BRACKETS

HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS

1. M easure 1-7/8" (4.8 cm) up from deck surface. Mark with light line.

4a. If installing

1

4

Signature post, center lower bracket on post below the marked line and attach using four self- tapping screws (provided).

1-7/8" (4.8 cm)

4b. If installing 4 x 4 post sleeve or Aluminum post sleeve, center lower bracket on post below the marked line and attach using four 2" (5.1 cm) wood screws (provided). 4c. If installing 6 x 6 post sleeve, center lower bracket on post below the marked line and attach using four 2-1/2" (6.4 cm) wood screws (not provided). NOTES: •  IMPORTANT - If installing a post sleeve with a one- piece skirt, ensure the skirt is installed BEFORE installing lower bracket.

2

2a. If installing Signature post, center lower bracket on post above the marked line and attach using four self-tapping screws (provided).

2b. If installing 4 x 4 post sleeve or Aluminum post sleeve, center lower bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided).

2c. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using four

• *Optional measurement if installing Signature Post: Measure from top of base plate 1-3/8" (3.5 cm).

2-1/2" (6.4 cm) wood screws (not provided).

3

32-5/16" (82.0 cm) or 38-5/16" (97.3 cm)

3.  Measure up from top of lower rail bracket 32-5/16"(82.0 cm) for 36" (91.4cm) tall railing or 38-5/16" (97.3 cm) for 42" (106.7 cm) tall railing from top of lower rail bracket. Mark with a light line.

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGNATUREMP-1225

Made with FlippingBook Digital Publishing Software