TREX SIGNATURE ® HORIZONTAL MESH RAILING Installation Instructions
HOW TO INSTALL MESH RAILING/ CONTINUED
Installing Vertical PVC Gaskets onto Vertical Supports (No cutting required these come standard size.)
16
18
16. Starting at one end, push mesh (with bottom PVC gasket installed) firmly into the bottom rail. GENTLE tapping with rubber mallet on mesh CROSS-SECTIONS will help prevent mesh from bending.
18. Align and install vertical PVC gaskets into the vertical supports.
NOTE: Make sure mesh is being secured by hand until final assembly of the top rail.
Installing Vertical Supports
Installing L-Brackets into Vertical Supports
19
17
Stop Tab
Stop Tab
17. Install L-brackets into both top and bottom slots of vertical supports as shown. L-brackets will require light tapping until stop lip of bracket is resting on vertical support.
19. Install vertical supports onto mesh panel, also ensuring that L-bracket is fully seated into bottom rail channel. IMPORTANT NOTE: USE SOAPY WATER ON THE VERTICAL SUPPORTS/PVC GASKETS TO ALLOW THIS TO SLIDE DOWN THE MESH PAN EL
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-SIGNATUREMP-1225
Made with FlippingBook Digital Publishing Software