HOW TO INSTALL MESH RAILING/ CONTINUED Installing Top PVC Gasket onto Mesh Panel
24
20
20.Install cut gasket onto top of mesh panel. Make sure gasket is fully seated onto mesh.
Installing Top Rail onto Mesh Panel
21
24. C ut snap-in channel filler to correct length and install into channels of bottom and top rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap in pieces with a miter saw. Use an angle grinder or hack saw only.
25
26
21. S tarting at one end and working down, press the top rail firmly onto the top of the mesh panel (with top PVC gasket on mesh). Ensure the top rail is centered properly so top rail will seat into brackets when finished.
Trex Signature ™ post ®
Attaching L-Brackets to Top and Bottom Rails
22
25. A ttach corresponding bracket covers over opening in upper and bottom rails. 26. A ttach provided post skirt to bottom of posts when using Trex Signature posts.
27b
27a
Post sleeve
® Trex Signature ™ post
22. .Attach L-Brackets to both top and bottom rails using one #8 x 5/8 flat head screw (provided).
23
Attaching Top Rail to Brackets 23. A ttach top rail to top
27a. .A ttach post caps to Trex Signature posts. (Use of rubber .mallet may be required for secure attachment). 27b. Attach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs) .
bracket using two #10 x 1" self-tapping screws (provided) on each side of bracket.
7
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-SIGNATUREMP-0825
Made with FlippingBook Digital Publishing Software