8SQMC-Squeeze Machine

21

20

19

With the included Short Bolt, slide a STAR WASHER on as shown.

Pass this bolt through the CHOCK from the INSIDE to Outside

Add a TRIANGLE thumbwheel to the Bolt end. This forms your first ‘chock’ and you will need to repeat the process on the Right Side

24

22

23

Thread the BLACK CAP end of the elastic behind the Assembly on

Then through the created loop, Pull up Tight.

Stretch the Elastic over the Upper Thumb Wheel – Adjust Chock to increase or decrease The Squash.

the lower frame

Made with FlippingBook - professional solution for displaying marketing and sales documents online