Requirements for Training
GWO Requirements for Training / V15 2025-04-01
Amendment date
Version
Approved by & date
08.03.2019
8
A & C 29.03.19
Description of changes
Foreword revised
•
• Section 2.1: included requirement for the certification body to be listed on the
GWO website as an approved certification body.
• Section 2.2 included requirement for WINDA upload within 10 working days.
• Amended website regarding fee structure to winda.globalwindsafety.org.
• Section 3: included the four pillars in a number list.
• Section 3.1.4: included requirement to store records of gap training and documentation.
Section 3.1.6: clarified wording.
•
• Section 3.1.8: specified time frame for notifying GWO of incidents and included OSHA definitions for incidents.
• Section 3.2.1: specified responsibility for equipment and facilities – particularly third-party equipment.
• Section 3.3.2: clarified Instructor qualification process when delivering training changed maximum instructor qualification maintenance period from 24 to 12- month interval. • Included requirement for another GWO instructor to observe and assess delivery of training every 12 months. • Section 3.3.4 (new): included requirement for training provider to ensure instructors implement updates from GWO.
• Section 3.3.6: removed reference to instructor/delegate ratio deviation
• Section 3.4.2: included requirement to ensure delegates are able to participate without sickness or substance abuse.
• Entire document: revised wording and corrected spelling errors
Amendment date
Version
Approved by & date
05.09.2019
7
Description of changes
Spelling aligned throughout document
•
Global Wind Organisation / www.globalwindsafety.org
66 / 70
Made with FlippingBook - professional solution for displaying marketing and sales documents online