Requirements Training V15

Requirements for Training

GWO Requirements for Training / V15 2025-04-01

Amendment date

Version

Approved by & date

08.03.2019

8

A & C 29.03.19

Description of changes

Foreword revised

• Section 2.1: included requirement for the certification body to be listed on the

GWO website as an approved certification body.

• Section 2.2 included requirement for WINDA upload within 10 working days.

• Amended website regarding fee structure to winda.globalwindsafety.org.

• Section 3: included the four pillars in a number list.

• Section 3.1.4: included requirement to store records of gap training and documentation.

Section 3.1.6: clarified wording.

• Section 3.1.8: specified time frame for notifying GWO of incidents and included OSHA definitions for incidents.

• Section 3.2.1: specified responsibility for equipment and facilities – particularly third-party equipment.

• Section 3.3.2: clarified Instructor qualification process when delivering training changed maximum instructor qualification maintenance period from 24 to 12- month interval. • Included requirement for another GWO instructor to observe and assess delivery of training every 12 months. • Section 3.3.4 (new): included requirement for training provider to ensure instructors implement updates from GWO.

• Section 3.3.6: removed reference to instructor/delegate ratio deviation

• Section 3.4.2: included requirement to ensure delegates are able to participate without sickness or substance abuse.

• Entire document: revised wording and corrected spelling errors

Amendment date

Version

Approved by & date

05.09.2019

7

Description of changes

Spelling aligned throughout document

Global Wind Organisation / www.globalwindsafety.org

66 / 70

Made with FlippingBook - professional solution for displaying marketing and sales documents online