Table 8.10: Long-Term Projects: Ranked Priority List (cont’d)

Prioritized

Cost Esti- mate (2025) $ 49,400,000.00 $13,756,896.00 $37,423,097.85 $112,156,245.72 $31,719,102.36 $ 61,600,000.00

Rank Facility

From

To

Project ID Scope

Boat Club Rd (FM 1220)

Widen from (2)-lane to (4)-lane divided roadway with shared-use paths

WJ Boaz Rd

Elkins School Rd

101

24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

Altamesa Blvd

Wichita St

Lana Cir

120 227

Construct a (4)-lane divided roadway Construct a (4)-lane divided roadway

Chapel Creek Blvd IH 30 (West Fwy)

Barnwell Drive

North Beach St

Keller Haslet Rd

Eagle Pkwy

238 Construct a (4)-lane divided roadway with shared-use paths Widen from (2)-lane to (4)-lane divided roadway

Sendera Ranch Blvd Diamondback Ln

Avondale Haslet Rd Wagley Robertson Rd

223 107

US 81/287 (Decatur Cut Off)

Bonds Ranch Rd

Widen from (2)-lane to (4)-lane divided roadway

Columbus Trail/ Sycamore School Rd Bryant Irvin Rd

Brewer Blvd

218 Widen from (2)-lane to (4)-lane roadway

$24,747,586.36

Widen from (3)-lane to (5)-lane roadway with center turn lane and reconstruct intersection

Chapin Rd

Chapel Creek Blvd Wispy Trail

309

$16,756,564.04

Precinct Line Rd/Cooks Lane

John T. White Rd Concho Trail

205

Construct a (4)-lane divided roadway

$127,556,217.09

23rd Street/Decatur Ave/Samuels Ave Niles City Blvd Wagley Robertson Rd Coneflower Tr

Construct roadway with a single bridge over the RR and shared-use paths and widen adjacent roadways Widen from (2)-lane to (3)-lane with center turn lane

Brennan Ave

122 217 121

$77,872,254.80 $40,624,447.33 $28,788,692.00 $17,544,140.00

City Limits

E Altamesa Blvd E Altamesa Blvd

Forest Hill Dr

Anglin

Construct a (4)-lane divided roadway

at FWRR Everman Subdivision

126 Construct a (3)-lane roadway with a TWLTL, at-grade RR crossing, and a single bridge over the creek

Widen from (2)-lane to (4)-lane divided roadway with shared-used paths on both sides, a raised median, and a twin bridge over the floodplain Widen from (2)-lane to (4)-lane divided roadway with shared-use paths

E Altamesa Blvd

Anglin Dr

Dick Price Rd

109

$58,945,880.00

Randol Mill Rd

Oakland Blvd

Woodhaven Blvd

211

$40,095,782.32

E Altamesa Blvd E Altamesa Blvd

Campus Dr

Witchita St Forest Hill Dr

126 Construct a (6)-lane divided roadway with a single bridge over the creek

$108,091,340.00 $23,041,720.00

Lana Cir Ramey St

118

Construct a (4)-lane divided roadway

Westshore Way (Quail Ridge Rd)

E. Berry St

210 Construct a (3)-lane undivided roadway with shared-use path $67,624,392.24

Construct a (4)-lane divided roadway with shared-use paths and a single bridge over the wetland and a flood zone Construct a new (4)-lane divided roadway crossing I-35W, RR and electric transmission lines and through floodplain Construct a new (2)-lane roadway crossing through wide floodplain Construct a new (2)-lane divided roadway crossing through wide floodplain

Green Oaks Blvd (in Arlington)

42

John T White Rd

Racquet Club Dr

213

$89,934,842.79

43

Old Blue Mound Rd FM 156

Litsey Rd

4022

$240,052,736.56

Greenbelt Rd (Fielder Rd Connection)

NW Green Oaks Blvd (in Arlington)

44 45 46 47 48 49

Greenbelt Rd

4015

$71,985,891.75

Sandshell Blvd

Alliance Town Ctr

Basswood Blvd

4016 4017

$71,658,176.00 $27,462,000.00

Amon Carter Blvd SH 183 (Airport Fwy) Trinity Blvd

Reconstruct (6)-lane divided roadway

Texas Longhorn Way I-35W SB FR

Old Denton Rd Founders Way Randol Mill Rd

4005 Construct a new (2)-lane roadway crossing of I-35W $21,329,157.20 4002 Construct a new (2)-lane roadway crossing of I-35W $17,500,213.16

Golden Triangle Blvd Little Cina Ln

Prestige Rd Winding Ln

4033

Construct a new (2)-lane roadway

$16,145,000.00

272

Fort Worth Master Transportation Plan | Prioritized Project List & TIP