Table 8.10: Long-Term Projects: Ranked Priority List (cont’d)
Prioritized
Cost Esti- mate (2025) $ 49,400,000.00 $13,756,896.00 $37,423,097.85 $112,156,245.72 $31,719,102.36 $ 61,600,000.00
Rank Facility
From
To
Project ID Scope
Boat Club Rd (FM 1220)
Widen from (2)-lane to (4)-lane divided roadway with shared-use paths
WJ Boaz Rd
Elkins School Rd
101
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Altamesa Blvd
Wichita St
Lana Cir
120 227
Construct a (4)-lane divided roadway Construct a (4)-lane divided roadway
Chapel Creek Blvd IH 30 (West Fwy)
Barnwell Drive
North Beach St
Keller Haslet Rd
Eagle Pkwy
238 Construct a (4)-lane divided roadway with shared-use paths Widen from (2)-lane to (4)-lane divided roadway
Sendera Ranch Blvd Diamondback Ln
Avondale Haslet Rd Wagley Robertson Rd
223 107
US 81/287 (Decatur Cut Off)
Bonds Ranch Rd
Widen from (2)-lane to (4)-lane divided roadway
Columbus Trail/ Sycamore School Rd Bryant Irvin Rd
Brewer Blvd
218 Widen from (2)-lane to (4)-lane roadway
$24,747,586.36
Widen from (3)-lane to (5)-lane roadway with center turn lane and reconstruct intersection
Chapin Rd
Chapel Creek Blvd Wispy Trail
309
$16,756,564.04
Precinct Line Rd/Cooks Lane
John T. White Rd Concho Trail
205
Construct a (4)-lane divided roadway
$127,556,217.09
23rd Street/Decatur Ave/Samuels Ave Niles City Blvd Wagley Robertson Rd Coneflower Tr
Construct roadway with a single bridge over the RR and shared-use paths and widen adjacent roadways Widen from (2)-lane to (3)-lane with center turn lane
Brennan Ave
122 217 121
$77,872,254.80 $40,624,447.33 $28,788,692.00 $17,544,140.00
City Limits
E Altamesa Blvd E Altamesa Blvd
Forest Hill Dr
Anglin
Construct a (4)-lane divided roadway
at FWRR Everman Subdivision
126 Construct a (3)-lane roadway with a TWLTL, at-grade RR crossing, and a single bridge over the creek
Widen from (2)-lane to (4)-lane divided roadway with shared-used paths on both sides, a raised median, and a twin bridge over the floodplain Widen from (2)-lane to (4)-lane divided roadway with shared-use paths
E Altamesa Blvd
Anglin Dr
Dick Price Rd
109
$58,945,880.00
Randol Mill Rd
Oakland Blvd
Woodhaven Blvd
211
$40,095,782.32
E Altamesa Blvd E Altamesa Blvd
Campus Dr
Witchita St Forest Hill Dr
126 Construct a (6)-lane divided roadway with a single bridge over the creek
$108,091,340.00 $23,041,720.00
Lana Cir Ramey St
118
Construct a (4)-lane divided roadway
Westshore Way (Quail Ridge Rd)
E. Berry St
210 Construct a (3)-lane undivided roadway with shared-use path $67,624,392.24
Construct a (4)-lane divided roadway with shared-use paths and a single bridge over the wetland and a flood zone Construct a new (4)-lane divided roadway crossing I-35W, RR and electric transmission lines and through floodplain Construct a new (2)-lane roadway crossing through wide floodplain Construct a new (2)-lane divided roadway crossing through wide floodplain
Green Oaks Blvd (in Arlington)
42
John T White Rd
Racquet Club Dr
213
$89,934,842.79
43
Old Blue Mound Rd FM 156
Litsey Rd
4022
$240,052,736.56
Greenbelt Rd (Fielder Rd Connection)
NW Green Oaks Blvd (in Arlington)
44 45 46 47 48 49
Greenbelt Rd
4015
$71,985,891.75
Sandshell Blvd
Alliance Town Ctr
Basswood Blvd
4016 4017
$71,658,176.00 $27,462,000.00
Amon Carter Blvd SH 183 (Airport Fwy) Trinity Blvd
Reconstruct (6)-lane divided roadway
Texas Longhorn Way I-35W SB FR
Old Denton Rd Founders Way Randol Mill Rd
4005 Construct a new (2)-lane roadway crossing of I-35W $21,329,157.20 4002 Construct a new (2)-lane roadway crossing of I-35W $17,500,213.16
Golden Triangle Blvd Little Cina Ln
Prestige Rd Winding Ln
4033
Construct a new (2)-lane roadway
$16,145,000.00
272
Fort Worth Master Transportation Plan | Prioritized Project List & TIP
Made with FlippingBook Annual report maker